GATE001 · condition-verification candidate

Close the semantics.
Open the integration.

PR #557 now gives the Program a usable communication contract, practical CBI/COMM construction shapes, and a versioned consistency boundary for the T106 successor. This gate asks one question: are those semantics strong enough to close AC010 and let #516 implement the mechanics without another vertical-integration ceremony?

Activity
T104-PH001-AC010 / SID T104
Gate
T104-PH001-AC010-GATE001
Package
PR #557
Parent intent
Issue #125
Successor
T106-PH000-AC005 / #516
Decision owner
HDO
Consultant recommendation · APPROVE WITH CONDITIONS

The four conditions discussed with the HDO are implemented in this candidate. Confirm the twelve story outcomes and condition evidence before authorizing merge; the durable platform act remains the gate decision.

HDO confirmation pending
1
Narrative

A message becomes accountable without becoming authority

The parent Activity asked for a workflow that can receive a request, find the right owner, distinguish in-scope routing from scope-changing absorption, preserve every requested-action leg, and close on durable communication evidence rather than waiting for successor delivery. The package now follows that story end to end.

01 · RECEIVE

Preserve the source

UID/SID, declared target, carrier, and receipt time.

02 · QUALIFY

Split action legs

Informational context is not requested work.

03 · AUTHORIZE

Read the owner

Authority and permitted actions precede mutation.

04 · DISPOSITION

Choose per leg

Six outcomes; edges never substitute.

05 · EVIDENCE

Prove terminality

Mutation, acceptance, lineage, and reconciliation.

06 · HAND OFF

Let #516 project

Mechanics implement against a versioned contract.

2
Scope horizon

Three moments, three different effects

The central boundary: PR #557 closes the T104 semantic package. It does not quietly implement the T106 publication or Program Board lane.

MERGE NOW · PR #557

AC010 semantics become the accepted source contract

  • Reusable communication guideline with Program WDL as its parent lifecycle router.
  • CBI/COMM fill shapes, examples, local handoffs, day-close, and carry-forward.
  • Versioned AC010→T106 consumer contract and executable divergence checks.
  • Human-facing GATE001 story review.
PREPARED NOW · ACTIVATE AFTER CLOSE

The Consultant has prepared the successor lane

  • The existing #516 PLAN body now uses the approved planning structure.
  • Its AC010 contract dependency and amendment trail are recorded.
  • After close, link the final merge/gate evidence and re-verify the Program Board projection.
  • Transition T106 to ready only after AC010's closeout act.
#516 IMPLEMENTS NEXT

T106 builds the vertical mechanics

  • Canonical GitHub CBI/COMM publication shapes.
  • Native relationships and Program Board communication view.
  • Projection, repair, and terminal synchronization helpers.
  • One conformance run; no repeated T104 acceptance if it passes.
Not in this merge: no Program Board schema/option, live view, PMB helper, GitHub issue guideline, native relationship, historical backfill, or T106-owned implementation file changes. Inspect the complete PR diff.
3
Operating model

Six dispositions answer six different questions

This is the semantic core #516 must preserve. Carrier status, board state, or an awareness edge cannot collapse these outcomes.

Answer

Accepted evidence already resolves the action. No receiver changes.

Archive / no-action

A durable rationale explains why no execution follows.

Route

The receiver already owns the exact outcome. Cite scope; do not edit the receiver.

Absorb

The receiver is right but its contract changes. Amend it and record its changelog.

Bounded direct change

One independently reviewable SID-scoped outcome fits one issue/PR path.

Promote formal execution

Material multi-step work gains an accepted governed successor.

4
Parent #125 user stories

Twelve outcomes worth confirming

Each card turns an important parent user story into an HDO question. Open its evidence drawer, inspect the artifact or diff, then confirm only if the outcome is understandable and true.

Review not started0 of 12 confirmed
US-02 · IDENTITY

Does governed identity lead platform identity?

The HDO should not decode work from issue numbers.

Candidate answer: yes. Source and receiver UID/SID lead every semantic payload; platform references remain supporting carriers.

Inspect identity evidence
US-03 · CONSTRUCTION

Could a future agent build a valid CBI or COMM from this package?

A principle without a fill shape is not an operating contract.

Candidate answer: yes. Dedicated copy/fill shapes cover daily CBI, COMM, action legs, all dispositions, day-close, carry-forward, terminal evidence, and local handoffs.

Inspect construction evidence
US-04 · DISPOSITIONS

Are the six terminal outcomes meaningfully distinct?

Answer, archive, route, absorb, direct change, and promotion cannot be cosmetic labels.

Candidate answer: yes. Each outcome has a different receiver-mutation and terminal-evidence contract, exercised by fixtures.

Inspect disposition evidence
US-05 · MUTATION

Will routing avoid needless receiver edits while absorption stays auditable?

The package must prevent “route” from hiding scope change.

Candidate answer: yes. Route forbids receiver mutation; absorption requires amendment plus governed changelog before closure.

Inspect mutation evidence
US-06 · HDO STOP

Does unresolved authority stop before material mutation?

Agents cannot settle Program consequences inside a carrier.

Candidate answer: yes. The authority check requires an HDO stop and reconfirmation before governed identity creation, accountability transfer, scope mutation, decision recording, or terminal transition.

Inspect stop controls
US-07 · ATOMIC LEGS

Can one incomplete leg or watch edge keep the carrier open?

Awareness and dependency must not masquerade as disposition.

Candidate answer: yes. Every leg needs its own disposition and evidence; watch, consumer, thematic, awareness-only, and dependency edges remain non-terminal.

Inspect leg evidence
US-08 · TERMINALITY

Can communication close without waiting for successor delivery?

The backlog should not stay open for the lifetime of downstream work.

Candidate answer: yes. Terminality attaches to accepted routing, mutation, successor lineage, evidence, and reconciliation—not successor completion.

Inspect terminal-evidence boundary
US-09 · DAILY HORIZON

Are daily CBI, day-close, and carry-forward operational?

One daily index must stay synchronized without duplicating authority.

Candidate answer: yes. The thin CBI index, idempotency boundary, day-close reconciliation, parent closure rule, and carry-forward payload are explicit and fillable.

Inspect daily-horizon evidence
US-10 · LOCAL CHANNELS

Do internal and external handoffs have safe exits?

Directory placement cannot imply authority, retention, or acceptance.

Candidate answer: yes. Both channels record direction, counterparty, sensitivity, retention, promotion, and revalidation; actionable cross-owner input receives separate disposition.

Inspect local-channel evidence
US-12 · VERTICAL ROUTING

Does Program WDL reach the communication guideline without duplicating every lifecycle owner?

Communication should be a nested child procedure, not a competing WDL manual.

Candidate answer: yes. Program WDL now routes Communication/CBI/COMM/local handoff work to the child guideline. The child returns lifecycle selection to Program WDL and directly names only the vertically integrated GitHub-publication and PMB-projection edges.

Inspect parent/child route evidence
5
Condition register

The four gate conditions, including the CND-01 extension, are candidate-satisfied

These conditions capture the improvements agreed in the gate discussion and the HDO-directed parent-router extension. “Candidate-satisfied” means implemented in the current worktree candidate; HDO confirmation and Consultant replay remain the acceptance acts.

candidate-satisfiedCND-01 · EXTENDED

Reusable guideline hierarchy, hygiene, and usability

Make Program WDL the parent router with one narrow child reference; retain only genuinely integrated communication edges; remove execution contamination; and preserve incomplete markers, source/projection controls, conflict checks, reading path, and size calibration.

candidate-satisfiedCND-02

Usable CBI/COMM construction

Provide fill shapes and examples for carriers, legs, six dispositions, day-close, carry-forward, terminal evidence, and local channels.

candidate-satisfiedCND-03

One successor consistency boundary

Version the T104→T106 contract, make compatibility observable, let passing T106 mechanics proceed independently, and detect semantic divergence.

candidate-satisfiedCND-04

Human-facing gate and truthful evidence

Rebuild the prior presentation as a parent-story review, link artifacts/diffs/evidence directly, distinguish merge effects from #516 work, and replay tests/browser QA.

6
Successor integration

One semantic contract, one mechanical owner, one return rule

T104 · SOURCE OWNER

AC010 fixes the meaning

  • Identity and authority.
  • Action legs and six dispositions.
  • Route/absorb mutation.
  • Acceptance and terminal evidence.
  • CBI/index and closure semantics.
T106 · MECHANICS OWNER

#516 builds the projection

  • GitHub title/body publication.
  • Native parent/child relationships.
  • Program Board fields and view.
  • Dry-run repair and reconciliation.
  • Terminal synchronization.
PASS · SAME MAJORT106 integrates and records conformance in its own evidence. No repeated T104 acceptance.
FAIL · MECHANICALT106 repairs its implementation and reruns the suite inside #516.
FAIL · SEMANTICOnly a proposed change to meaning, authority, mutation, acceptance, or terminality returns to T104/HDO.
Governance handoff: the Consultant has already amended the existing #516 PLAN and posted its amendment trail. Its Project item remains intentionally planned. After AC010 closes, the Consultant links the final gate/merge evidence, re-verifies required fields, and activates that lane through the governed status path.
7
Gate decision

Approve the semantic package; preserve the successor boundary

Decision prompt: Has PR #557 candidate-satisfied CND-01 through CND-04 and the twelve parent-story outcomes strongly enough to merge, close AC010, and immediately initialize the #516 vertical-integration lane?

Recommended

Approve with conditions confirmed

Confirm the twelve story cards and condition-verification evidence, then record the durable gate act. The Consultant may merge PR #557, complete AC010 closeout, attach the final evidence to the already-amended #516 PLAN, verify its projection, and initialize the successor lane.

Other valid gate outcomes

  • Recycle: identify a failed condition or story outcome and its exact re-entry evidence.
  • Hold: pause for an external dependency or authority decision without rejecting the package.
  • Kill: decline the Activity direction and do not merge.
Gate ID
T104-PH001-AC010-GATE001
Consultant recommendation
APPROVE WITH CONDITIONS CONFIRMED
Conditions
CND-01 through CND-04 · candidate-satisfied; HDO confirmation pending
HDO decision
pending durable platform act
Merge effect
Accept AC010 semantic/template/conformance package; no T106 implementation.
Immediate successor act
Consultant binds final closeout evidence to the amended #516 PLAN and initializes it through governed status mechanics after AC010 close.
Decision reference
PR #557 reply and/or #125 ledger record
8
Evidence index

Direct paths behind the review